Description
For fixing posts, road signs and bollards
No requirement for mixing – just add water after placing
As a guide a 2.4m post should have 0.6m below and 1.8m above ground level. Setting is normally in 10-15 minutes but may be longer in cold weather.
Supplied in a waterproof bag
Reviews
There are no reviews yet.